Welcome to our new website, we’ve rebranded.

Play|Chantry Community Academy Multiplay

The Brief: The Client was looking to install a large climbing play structure to accommodate lots of children during playtime. They wanted various heights and levels to allow children to progress on the unit and challenge themselves. Equipment Installed: -0211-1 Vinci Steel Multiplay Unit – 9 platforms and 25 play activities -Blue wet pour surfacing … Read more

MUGA|Archway Learning Trust-Bluecoat Primary Academy MUGA

The Brief: The Client were looking for a large MUGA to be installed with various different sports options for the children to enjoy. Equipment Installed: • 31m x 14.5m MUGA with Championship Fencing • Tarmac Surfacing • 4 mini goals • 2 Multi Active panels (Cricket and Skills) • Sports line markings The Challenges: The … Read more

Surfacing|Old Buckenham Hall School Wet pour playground transformation

The Brief: The Client were looking to transform their playground into a bold and colourful space for children to play on their break times. Wet pour surfacing : Our wet pour impact absorbing surfacing is designed to offer maximum safety performance with high durability and cost effectiveness. The wet pour surface construction is formulated from … Read more

Outdoor Gym|Harehills Primary School Outdoor Gym Case Study

The Brief: The Client were looking to install an outdoor gym into their playground. They wanted the area fenced to ensure children were supervised using the equipment and a range of cardiovascular workout options. Equipment Installed: -Cross Rider -Air Walker -Workout Boxes -Body Twist -Rider -Skier -Arm Bike The Challenges: The installation took place in … Read more

Daily Mile|Whipperley Infant Academy – Daily Mile Track

The Brief: The Client were looking for a Daily Mile track for the pupils to use for their Daily Mile initiative. The track was to go round the playing field and durable to be used all year round. Equipment Installed: SUDS Bond Track – Silver The Challenges: The installation was completed in half term to minimise … Read more

Daily Mile|Cubitt Town Junior School Daily Mile Track

The Brief: The Client were looking to get on board with the Daily Mile initiative and were interested in having a new track installed around their grounds. The Caloo representative visited site to discuss surfacing options available. We allowed to install 20mm depth of wet pour rubber surfacing on the existing macadam area and 50mm … Read more

Outdoor Gym|Athena School – Outdoor Gym & Outdoor Classroom

The Brief: The Client were interested in providing some outdoor opportunities for their pupils. Outdoor gym equipment was discussed to offer fitness and exercise options to the students along with an Outdoor Classroom for teaching outside for a relaxing shaded space during recreational time. Equipment Installed: – Education Bundle on grassmatting -Outdoor Classroom – Hexagon … Read more

Outdoor Gym|Perivale Primary School – Outdoor Gym

The Brief: The Client had heard about outdoor gyms from other local schools and were interesting in getting more information on what would be best for their site. We were happy to discuss options for unit and those best suited for Primary School age children. Equipment Installed: • Skier • Arm Bike • Air Walker … Read more