Welcome to our new website, we’ve rebranded.
Home / Products / Surfacing / Play Surface Markings
Product Range

Play Surface Markings

Playground markings are the most affordable way to change how a playground is used. We design and install thermoplastic markings for schools and parks so that they outlast painted markings many times over.

Filter

Sub-category

Play Surface Markings

Why it matters

The Benefits of Playground Markings

A set of markings costs a fraction of a single piece of play equipment and usually changes more about how a playground works. They also solve the problem that equipment cannot: giving thirty children something to do at once.
  • Cheapest change per child – For the price of one climbing unit you can mark an entire playground, which is why markings are usually the first thing we recommend for a tight budget.
  • Structure for busy playtimes – Marked games give children something to join rather than something to queue for, which noticeably reduces the wandering and the fallouts that come with it.
  • Learning outside the classroom – Number lines, alphabet snakes, phonics grids and clock faces let teachers take literacy and numeracy outdoors without carrying resources out with them.
  • Thermoplastic, not paint – Markings are heat-bonded into the tarmac rather than painted on top, so they last five to ten years instead of fading within a couple of terms.
  • Fitted in a day – Most schemes are installed in a single visit with no curing time, so the playground is back in use the next morning.
Proven success stories
Education

Play | Canolfan Yr Afon Infant School Outdoor Classroom and Steel Trim Trail

The Brief: The Client wanted to develop an infant play space within their school. They were also interested in installing…
Government

Play|Fleet Town Council – Playground and Bonded Rubber Mulch Surfacing

The Brief: The Client tendered for an older year’s playground to be built alongside their existing infant area. The site…
Education

Springwell School: Encouraging Daily Activity with a SUDS Bond Mile Track From Vision to Reality at Springwell School

The Vision Springwell School sought to encourage daily physical activity by installing a dedicated Daily Mile track around their playing…
Education

Surfacing| Tweendykes School, Wet Pour Surfacing

The Brief: The client wanted to replace their current rubber surfacing as it had become tired and had lost its…
FAQs

Frequently asked questions

Everything you need to know about specifying, installing and maintaining Play Surface Markings.
What are thermoplastic playground markings?

Pre-formed plastic shapes are laid onto the tarmac and heated until they bond to the surface. Unlike paint, which sits on top and wears off, thermoplastic becomes part of the surface, which is why it lasts years rather than terms.

How long do playground markings last?

Five to ten years on tarmac in normal school use, depending on foot traffic and the condition of the surface underneath. Markings on a worn or crumbling playground will fail early no matter how well they are laid, which is why we check the surface before quoting.

Can old playground markings be removed?

Yes. Faded or unwanted markings can be removed by shot blasting or burning off, and we usually do this as part of a new installation rather than laying over the top. Marking over old markings looks poor and shortens the life of the new ones.

What surface can markings be applied to?

Tarmac and macadam take thermoplastic best. Concrete needs a primer and does not hold quite as well. Markings cannot be applied to wetpour, artificial grass or resin surfaces, though on those we can form colour and graphics into the surface itself instead.

Accreditations