Welcome to our new website, we’ve rebranded.
Home / Products / Outdoor Shelters & Furniture / Outdoor Shelters
Product Range

Outdoor Shelters

Somewhere to sit, somewhere to shelter. We design, supply and install playground shelters and outdoor furniture for schools, parks and public spaces across the UK, from steel and timber canopies to benches and planters that stay out all year and still look right in ten years.

Sub-category (Redesign)

Filter

Sub-category
Sub-category (Redesign)

Triangle Shade with Options

Extended Hex with Optional Upgrades

Square Shade Shelter

Hex Shelter with Optional Upgrades

Steel Shelter

Why it matters

The Benefits of Park & Playground Shelters

Shelters and seating are what turn an outdoor space into somewhere people actually stay. They cost a fraction of the equipment around them and usually get more use, because they work in weather that stops everything else.
  • Playtime carries on in the rain – A playground shelter keeps children outside on wet days instead of penned into a hall, which is why most schools we work with wish they had installed one sooner.
  • Teaching space without a building – Our shelters take a class of thirty with seating, so schools get a usable outdoor classroom without planning a permanent extension.
  • Somewhere for everyone, not just the players – Benches and accessible seating give parents, carers and less active children a reason to stay, which changes who uses a park rather than just how often.
  • Made to be left out – Galvanised steel frames, marine-grade timber and powder-coated finishes handle British weather without annual treatment or seasonal storage.
  • Fits around what is already there – We retrofit shelters and furniture onto existing sites, so you are not rebuilding a playground to add somewhere to sit.
Proven success stories
Education

Outdoor Gym|Athena School – Outdoor Gym & Outdoor Classroom

The Brief: The Client were interested in providing some outdoor opportunities for their pupils. Outdoor gym equipment was discussed to…
Government

Outdoor Gym|Beenham Parish Council Youth Shelter and Outdoor Gym

The Site: Beenham Parish Council, Reading – Local Community Space. The Brief: The client indicated they were looking for Youth…
Education

Play | Canolfan Yr Afon Infant School Outdoor Classroom and Steel Trim Trail

The Brief: The Client wanted to develop an infant play space within their school. They were also interested in installing…
Commercial

Play|Westfield Stratford Table Tennis Tables

The Brief: The Client were look to install an additional four outdoor table tennis tables outside their shopping centre complex.…
FAQs

Frequently asked questions

Everything you need to know about specifying, installing and maintaining Outdoor Shelters.
Do playground shelters need planning permission?

Usually not, but it depends on the size, height and where it sits. Most standard shelters on school grounds fall under permitted development, though anything near a boundary, in a conservation area or attached to a listed building will need checking. We flag this early in the design rather than at installation, and we can supply drawings if your local authority asks for them.

What are your outdoor shelters made from?

Steel or timber, depending on the setting. Galvanised steel with a powder-coated finish suits high-traffic and urban sites where vandalism is a concern. Timber sits better in parks and rural schools and gives a warmer feel. Both use roofing rated for UK wind and snow loading, and both need very little maintenance.

Can a shelter be added to an existing playground?

Yes, and it is one of the more straightforward additions. We survey the ground conditions, existing surfacing and any drainage, then design around them. Most installations take a few days on site and can be scheduled during a school holiday so that play is not disrupted.

How long does it take to install school and playground outdoor furniture and shelters?

Most furniture and bench installs take one to three days on site. Larger playground shelters and school fencing schemes typically run one to two weeks, depending on foundations and surfacing.

Accreditations