request a call back
  • Enter the result of 8+14
speak to us 01296 614448

Case Studies


The new gym has provided a good exercise trail along the existing path. The SUDS bond allows use of the gym in all weather conditions as SUDS offers fast drainage and no surface water build up. As the site is popular with dog walkers a dog lead post was installed at each two unit pad. This allows dog walkers to stop off and work out safely with their dog closely by. The site offers a wide range of unit for strength and cardiovascular activities along with two wheelchair friendly units.

CLICK TO READ THE FULL STORY

The choice of the snake slide offered an easy access steps to a slide, along with seating under the unit for children to rest. The Fire Engine playhouse is create to spark imagination with little ones and offers a host of moving panels including a driving area with steering wheel and moving levers, this is a great social play unit.

CLICK TO READ THE FULL STORY

The new fitness space allows the community to workout at the gym with 18 user stations and 12 units or play football or basketball on the MUGA. Spectators can also sit and watch sports matches in the new sheltered Youth Shelters. We selected Matchplay 2 for the sports surfacing as this offers fantastic ball properties for a range of sports with low sand content for all year-round use. A great fitness site for all ages and abilities to use.

CLICK TO READ THE FULL STORY

The new playground was a stunning transformation and children were delighted to start the first day back running over rainbows and hoping along coloured dots. This provided a safe play space for all age groups and allowed free and creative play for children to play.

CLICK TO READ THE FULL STORY

The new units and safety surfacing has provided a fantastic range of new activities into each playground. Each multiplay is packed with activities from climbing, sliding, play panels and more. The installation was completed swiftly, and the sites were back open to the public in a timely manner. A huge success to transform older sites with a simple unit upgrade at each site.

CLICK TO READ THE FULL STORY

The new MUGA has created a fantastic sports facility for all users to enjoy. With the addition of two multiactive panels the site is now suitable for football, basketball and cricket. The site was constructed with green steel and green acrylic coating to blend in with the park surroundings. The site has been well used by local teams and groups in the area and is a great new addition for the community.

CLICK TO READ THE FULL STORY

THIS MONTHS SPECIAL OFFERS

New offers or bundle packages will appear here every month so please check back to get the latest deal.